LED display installation methods.
LED display installation methods and standards:
 
General reaction against some of the problems customers , We will be concerned and provide technical support. Some customers ask us to buy back is to provide installation, some customers buy their own screens back, is looking for contractors to install , and some contractors have more experience , some of it is no experience to talk about, in the customer's led display installed above do somethings .
 
So as a professional display supplier and solutions provider , What is the difference between us and others?
 
Generally speaking, indoor display is divided into : wall , ceiling , inlaid three installation methods.
 
The first : Wall
For the environment:
This installation method is suitable for the following environments:
 
Wall must have sufficient load-bearing capacity , and easy to use expansion bolts, bolts or easy welding ordinary wall ( such as steel structure of the wall ) to facilitate fixed on the wall mount display pendant.
 
1 , the wall before installation must understand whether there is sufficient load-bearing capacity to fix the display ( calculated as follows: 1 square meters of indoor display weight is 35 kg , according to the display of the actual total area calculated from the total number of display weight to see whether it can withstand such a heavy wall display. )
 
2 , to determine its load-bearing capacity of the wall there is enough after , according to the customer's actual requirements ( installation location, mounting height , distance around ) after the actual measurement , make detailed records on the wall and make the scale, the scale , must be clearly marked in order to better carry out the next step ,
Specific steps are as follows :
First, according to customer requirements as determined by reference to the reference point for the baseline start or measure , measure out the installation location screen reference points from the reference or the exact size , first determine a good mounting height , and then determine a good distance and marked with the left Measure the distance from the location. Then measured position minus the thickness of the display frame , and make a mark , and make detailed records.
 
3, according to the height of the display is good to use to determine the number of pendant and make a mark . Specific steps are as follows :
First measure the length and width of the screen , and make a record . Then calculate the density of pendant , pendant and pendant that distance , you must follow the standard (1M high display, hanging pendant with a distance of 1.5M) conduct , particularly small screen at least not less than two pendant. To more firmly fixed to the display .
 
4 , the fixed display pendant
First, fixed at both ends of the display pendant. With horizontal tube measurements to determine the two pendant in the same plane . After both ends fixed to the two pendant pendant plane as the standard install other accessories .
 
5, the installation screen
The display hanging pendant installed at a later time , screw the display frame and hanging securely connected.
Test: To install the display level , two levels of not more than 5 mm
 
The second: lifting
For the environment:
This installation method is suitable for the following environments:
Four weeks no walls, no available fixed- point indoor display . And there is sufficient load-bearing capacity of the roof .
 
1, the installation must understand the roof or other jacking whether there is sufficient load-bearing capacity to fix the display ( calculated: one square meter of indoor display weight is 35 kg , according to the display of the actual total area calculated display a total of how much weight the roof or other jacking see whether it can withstand such a heavy display. )
 
2, to determine adequate roof or other load-bearing capacity jacking later , according to the customer's actual requirements ( installation location ) for the actual measurement , make detailed records, and do a good job on the roof or other jacking scale , scale , must to clearly labeled to better carry out the next step ,
 
3, according to the height of the display is good to use to determine the number of pendant and make a mark . Specific steps are as follows :
First measure the length and width of the screen , and make a record . Then calculate the density of pendant , pendant and pendant that distance , you must follow the standard (1M high display, hanging pendant with a distance of 1.5M) conduct , particularly small screen at least not less than two pendant. To more firmly fixed to the display .
 
4 , the fixed ceiling pendant display
First, fixed at both ends of the display lifting pendant. With pull measurements. After both ends fixed to the two lifting pendant pendant as a standard install other intermediate lifting pendant.
 
5, the installation screen
Hanging on the display is installed on the ceiling pendant after the display frame with screws and lifting accessories are securely connected.
Test: To display hoisting equipment level, two levels of not more than 5 mm
Third: Mosaic
For the environment:
All necessary concealed display.
1, the installation must understand the finished size of the display , and then do the mosaic at the size you want to display the finished size prevail.
2, the entire display to be mounted into place
3 , the fixed display frame , with screws to connect the display frame and the surrounding material is securely connected to
Test: To install the flat screen , flat with inlay around the border at the outer surface of the distance to be consistent . Error not exceeding 5 mm
 
Second, the outdoor display of installation methods and standards:
Outdoor led display installed in two ways: to sit and structural frame mounted mosaic installation.
 
1 , sitting loaded
For the environment:
Installation is that a plane ( such as the roof, floors, etc. ) .
One , first consider whether there is sufficient installed at the load-bearing capacity ( one square meter outdoor display of weight 65 kg ) .
Second, be sure to install Office has sufficient load-bearing capacity of the future , and make sure the installation location survey work , good marking . Calculate the number of pendant display .
Third, according to the box on pendant mounting position fixed outdoor screen display pendant.
Fourth, install display cabinet . The display cabinet placed in a fixed good hanging on and bolt the display cabinet and pendant securely connected.
V. Installation display unit .
From bottom to top, from left to right in the order display units installed , install the display unit should be installed neatly , and at every display unit before installing the display unit to snapping point marked with waterproof glass, plastic, and then display unit fixed on the housing and tighten the screws.
Six , waterproof display four weeks
After all display units installed, the display shows the unit four weeks marked waterproof glass, plastic, fight even and firm .
Seven , checking waterproof glue at all to play
Waterproof glass glue kick after the check again to be careful . To see if tainted gum uneven playing and playing at the drain uneven playing and playing at the re- branded waterproof glue plastic glass . Until all waterproof glass glue all dealt with properly .
Test: The display shows the surface to be smooth, the entire plane after no more than 5 mm, no leaks .
 
2, the structure frame mosaic installation
For the environment:
Area of ​​more than five square meters of non- strip screen display
One , first determine for installation screen length and height for the installation process to lay the foundation behind
Second, do the structure
Structure must be made ​​to take into account the structure of the load-bearing capacity ( one square meter outdoor display of weight 65 kg ) . According to such a good screen display unit structure , size should be in strict accordance with the specifications of the display unit is determined .
Third, install the display unit
After construction began installing an outdoor display unit . Install display unit should follow from left to right , top to bottom in the order installation. When installing the display unit to be installed neatly , and at every display unit before installing the display unit to snapping point marked with waterproof glass, plastic, and then fixed to the structure of the display unit and tighten the screws.
Six , waterproof display four weeks
After all display units installed, the display shows the unit four weeks marked waterproof glass, plastic, fight even and firm .
Seven , checking waterproof glue at all to play
Waterproof glass glue kick after the check again to be careful . To see if tainted gum uneven playing and playing at the drain uneven playing and playing at the re- branded waterproof glue plastic glass . Until all waterproof glass glue all dealt with properly .
Test: The display shows the surface to be smooth, the entire plane after no more than 5 mm, no leaks
 